{"id":3243,"date":"2026-10-23T05:00:36","date_gmt":"2026-10-23T05:00:36","guid":{"rendered":"https:\/\/stuorgs2.gcc.edu\/thecollegian\/?p=3243"},"modified":"2026-10-23T12:45:28","modified_gmt":"2026-10-23T12:45:28","slug":"construction-begins-on-new-athletic-facilities","status":"publish","type":"post","link":"https:\/\/stuorgs2.gcc.edu\/thecollegian\/2026\/10\/23\/construction-begins-on-new-athletic-facilities\/","title":{"rendered":"Construction begins on new athletic facilities"},"content":{"rendered":"\n<p class=\"has-text-color wp-block-paragraph\" style=\"color:#63635c;margin-bottom:22px;font-size:0.85rem;font-style:italic\">By <a href=\"https:\/\/stuorgs2.gcc.edu\/thecollegian\/tag\/steven-mauch\/\" data-type=\"post_tag\" data-id=\"88\">Steven Mauch<\/a> \u00b7 Assistant Business Manager<\/p>\n\n\n\n<figure class=\"wp-block-image alignwide size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"768\" src=\"\/wp-content\/uploads\/sites\/6\/2026\/10\/construction-2-CMYK-1024x768.webp\" alt=\"\" class=\"wp-image-3244\" srcset=\"\/wp-content\/uploads\/sites\/6\/2026\/10\/construction-2-CMYK-1024x768.webp 1024w, \/wp-content\/uploads\/sites\/6\/2026\/10\/construction-2-CMYK-300x225.webp 300w, \/wp-content\/uploads\/sites\/6\/2026\/10\/construction-2-CMYK-768x576.webp 768w, \/wp-content\/uploads\/sites\/6\/2026\/10\/construction-2-CMYK-1536x1152.webp 1536w, \/wp-content\/uploads\/sites\/6\/2026\/10\/construction-2-CMYK-2048x1536.webp 2048w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><figcaption class=\"wp-element-caption\">A construction vehicle prepares ground for the new Stewart Field. (GCC)<\/figcaption><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\">New athletic facilities are under construction at Grove City College, with the William C. Stewart Baseball Field and the McNulty Athletic Center scheduled for completion in early 2027.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Jeffrey Prokovich, vice president of advancement, noted that work has already been done, with preliminary preparations and earth removal occurring over fall break.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Due to the rather isolated construction location, Prokovich estimated the construction project will suffer little disruption and should be done in a matter of months. While not exactly speedy, this timeline is a change of pace from the recent construction project on Rockwell and Smith Hall, which took two years to complete.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The new baseball field will be built on the site of R. Jack Behringer Field, the current baseball field. The McNulty Athletic Center is being built on the field between the Physical Learning Center (PLC) and the soccer field.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">According to Prokovich, the current baseball field has been an \u201cinferior field for many years,\u201d and renovations for PLC weight rooms \u201care long overdue.\u201d<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Prokovich said Stewart Field should be ready for baseball in the spring and cost approximately $5 million.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">&nbsp;The McNulty Athletic Center is estimated to cost around $7 million.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">For staff and students who spend most of their time on the field or in the gym, these renovations mean more than just aesthetics.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u201cThey\u2019re also going to put in new batting cages, new dugouts (and a) new backstop, which is going to make everything safer for everybody,\u201d said Assistant Athletic Director and men\u2019s soccer coach Mike Dreves. \u201cIf you go out to the baseball field now, you\u2019ll see its grass, and right field is 10 feet higher than home plate. The field\u2019s not level, even.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u201cWe\u2019ve got a great baseball team, and I think we will have a great facility for them to play in. The bubble is going to provide tennis courts, indoor track, locker rooms and then a weight room, which is going to provide great athletic facilities for our athletes, but also relieve the strain on the PLC.\u201d<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Graham Romer, a sophomore pitcher on the baseball team, agrees.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u201cI think it\u2019s going to be awesome,\u201d he said. \u201cWe will get to practice a lot more and play a lot more when (at) times, we wouldn\u2019t have been able to because of weather.\u201d<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Romer also hopes the Athletic Center will provide new training advantages by including turf.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">&nbsp;\u201cIt will help our fielders get better with their fielding and also get used to playing on other people\u2019s fields, because right now, we practice on our field,\u201d Romer said. \u201cAnd that gets us to be used to our field hops and not the other people\u2019s, so it\u2019s better overall for sure.\u201d<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">A field hop, or the behavior or bounce of a ball depending on the ground it lands on, can vary greatly depending on the field you play on. Players who can practice on fields that create a similar \u201chop\u201d to where they compete will be better able to predict the movement of the ball.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">While it will immediately benefit current students, Romer believes this renovation will have a great marketing allure, saying the better fields may bring in more recruits.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Dreves is already thankful for the renovation and foresees big things for Grovers who want to play ball.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u201cWe\u2019re just really thankful that people have contributed financially to make this possible,\u201d Dreves said. \u201cWe\u2019re appreciative of the opportunity that we\u2019re going to have to have some really nice facilities. And, I think, in our league, we have the potential to have, top to bottom, (the) best facilities in the conference.\u201d<\/p>\n\n\n\n<p class=\"has-text-color has-background wp-block-paragraph\" style=\"border-radius:6px;color:#7a5a12;background-color:#fdf3d0;margin-top:28px;padding-top:12px;padding-right:14px;padding-bottom:12px;padding-left:14px;font-size:0.85rem;line-height:1.6\"><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n","protected":false},"excerpt":{"rendered":"<p>By Steven Mauch \u00b7 Assistant Business Manager New athletic facilities are under construction at Grove City College, with the William C. Stewart Baseball Field and the McNulty Athletic Center scheduled for completion in early 2027. Jeffrey Prokovich, vice president of advancement, noted that work has already been done, with preliminary preparations and earth removal occurring [&hellip;]<\/p>\n","protected":false},"author":13,"featured_media":3244,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_uag_custom_page_level_css":"","footnotes":""},"categories":[186],"tags":[178,250,18,284,88],"class_list":["post-3243","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-campus","tag-2026-edition","tag-campus","tag-news","tag-oct-23","tag-steven-mauch"],"uagb_featured_image_src":{"full":["\/wp-content\/uploads\/sites\/6\/2026\/10\/construction-2-CMYK-scaled.webp",2560,1920,false],"thumbnail":["\/wp-content\/uploads\/sites\/6\/2026\/10\/construction-2-CMYK-150x150.webp",150,150,true],"medium":["\/wp-content\/uploads\/sites\/6\/2026\/10\/construction-2-CMYK-300x225.webp",300,225,true],"medium_large":["\/wp-content\/uploads\/sites\/6\/2026\/10\/construction-2-CMYK-768x576.webp",768,576,true],"large":["\/wp-content\/uploads\/sites\/6\/2026\/10\/construction-2-CMYK-1024x768.webp",1024,768,true],"1536x1536":["\/wp-content\/uploads\/sites\/6\/2026\/10\/construction-2-CMYK-1536x1152.webp",1536,1152,true],"2048x2048":["\/wp-content\/uploads\/sites\/6\/2026\/10\/construction-2-CMYK-2048x1536.webp",2048,1536,true]},"uagb_author_info":{"display_name":"puruckermt24","author_link":"https:\/\/stuorgs2.gcc.edu\/thecollegian\/author\/puruckermt24\/"},"uagb_comment_info":0,"uagb_excerpt":"By Steven Mauch \u00b7 Assistant Business Manager New athletic facilities are under construction at Grove City College, with the William C. Stewart Baseball Field and the McNulty Athletic Center scheduled for completion in early 2027. Jeffrey Prokovich, vice president of advancement, noted that work has already been done, with preliminary preparations and earth removal occurring&hellip;","_links":{"self":[{"href":"https:\/\/stuorgs2.gcc.edu\/thecollegian\/wp-json\/wp\/v2\/posts\/3243","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/stuorgs2.gcc.edu\/thecollegian\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/stuorgs2.gcc.edu\/thecollegian\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/stuorgs2.gcc.edu\/thecollegian\/wp-json\/wp\/v2\/users\/13"}],"replies":[{"embeddable":true,"href":"https:\/\/stuorgs2.gcc.edu\/thecollegian\/wp-json\/wp\/v2\/comments?post=3243"}],"version-history":[{"count":5,"href":"https:\/\/stuorgs2.gcc.edu\/thecollegian\/wp-json\/wp\/v2\/posts\/3243\/revisions"}],"predecessor-version":[{"id":3320,"href":"https:\/\/stuorgs2.gcc.edu\/thecollegian\/wp-json\/wp\/v2\/posts\/3243\/revisions\/3320"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/stuorgs2.gcc.edu\/thecollegian\/wp-json\/wp\/v2\/media\/3244"}],"wp:attachment":[{"href":"https:\/\/stuorgs2.gcc.edu\/thecollegian\/wp-json\/wp\/v2\/media?parent=3243"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/stuorgs2.gcc.edu\/thecollegian\/wp-json\/wp\/v2\/categories?post=3243"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/stuorgs2.gcc.edu\/thecollegian\/wp-json\/wp\/v2\/tags?post=3243"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}